What is maintenance cost of solar panel in India?

What is maintenance cost of solar panel in India  Faults in solar power plants can catch building fire. This does not mean solar systems are...

Thursday, August 6, 2020

Get Rupees 10 Lakh per MW in Solar Business


Get Rupees 10 Lakha Per MW

Get Rupees 10 Lakh per MW in Solar Business 

 consider joining us as a Business Partner. The primary function would be to bring          connects in Companies and support in Business Development. Remuneration is          INR 10 Lakhs for 1 MWp of solar installed.

We have Following options for  this business Model 
1)    Opex Model
This is a zero investment model for the customer. In this model, surise solar or investor will enter into a power purchase agreement of 10-25 years with the customer. Under the power purchase agreement, surise solar will build, operate and maintain a solar power plant and sell the electricity produced from the solar power plant to the customer for the term of the agreement. After the end of the agreement, the power plant is transferred to the customer free of cost. surise solar specializes in OPEX model power plants and caters to this segment.
2) Capex Model
This is a complete upfront investment model. In this model, the customer pays the entire cost for solar power plant upfront and the electricity produced from the solar power plant is free for the customer for the UTILITY-SCALE AND DISTRIBUTED SOLAR ENERGY GENERATION
Solar energy technology can be applied at varying scales, including utility-scale generation and distributed generation life of the solar power plant.
3) On-site solution:
Commonly known as rooftop or captive solution. In this solution, surise solar will set up a solar power plant on the customer’s site itself. The power plant can be set up on the roof top or available land on customer’s site. We don’t use government’s infrastructure to transfer electricity to the customer’s site as the power plant is set up at the customer’s site itself.
4) Off-site solution:
Commonly known as open access or group captive solution. In this solution, in case the customer has a huge power consumption and doesn’t have enough space on their facility surise solar will buy land in a remote location and transfer electricity to the customer’s site using government’s transmission lines and other infrastructure.
What You Have To Do
1) Identify customer
2) Go through partner Policy  
3) Do Partner Agreement as agent or as company 
4) Understand customers requirement as below
For On-site solution:
1) The customer have a connected load of at least 150 kWp
2) The customer have unit consumption of at least 15,000 units per month
3) The customer have at least 1200 sq. meter of shadow free space available
For off-site solution:
The minimum power plant size we go for 1000 kWp and only in specific states. This means, the customer must fulfill the below mentioned requirements:
1) The customer must have a connected load of at least 1200 kWp
2) The customer must have a unit consumption of at least 1,20,000 units per month
5) Reliability of the customer
surise solar needs to minimize the risk associated with the investment to be made for solar power plant for the customer. Therefore, surise solar needs to verify the financial credibility of the customer. This check is done for both on site as well as off site customers.
6) Inform us customers details of requirement we check viability of project and inform you
In case you have connects with customers in any region and you are interested to work with us, please do reach out to me.
Thanks.
Shasikant Thorat
9762645955



No comments: